ELFOR
en
Emergency repair works on EVN electrical grid
Client: Elektrorazpredelenie Yug EAD (EVN)
Emergency restoration of wrecked overhead power lines of the electrical distribution grid of EVN – KEZ Momchilgrad, KEZ Zlatograd, KEZ Krumovgrad, KEZ Asenovgrad from 07.03.2015 until 20.03.2015
Restoration and reconstruction of overhead power lines low voltage (0.4kV) and middle voltage (20kV) with installing new masts, switchgear, insulators and wires.
Year of completion: 2015
Amount: 2,002,000 BGN